On December 27, 2023, TEC issued a notification partially amending no. 5-2/2021-TC/TEC/131 and 5-2/2021-TC/TEC/172. Accordingly, the mandatory certification date of 12 products out of 44 products under MTCTE Phase 3 and 4 has been postponed from January 1, 2024 to April 1, 2024. The mandatory date of the remaining 32 product shall remain unchanged.
The postponed products are as follows:
Phase | Products |
Phase-3 | Base Station for Cellular Network |
Repeater for Cellular Network |
|
Smart Electricity Meter | |
Phase-4 | SIM |
HF Radio |
|
Mobile Radio Trunking System |
|
VHF UHF Radio System Equipment |
|
PTP PMP Microwave Fixed Radio System |
|
LAN Switch |
|
Router |
|
Satellite Communication Equipment |
|
IP Security Equipment |
In addition, for 8 products, the last date of acceptance of ILAC Test Report has been extended by 3 months for technical parameters only - from December 31, 2023 to March 31, 2024.
The 8 products are as follows:
Phase | Products |
Phase-3 | Base Station for Cellular Network |
Repeater for Cellular Network |
|
Compact Cellular Network | |
Phase-4 | SIM |
HF Radio |
|
VHF UHF Radio System Equipment |
|
Radio Broadcast Receiver RBR | |
Satellite Communication Equipment |
'JNM Global' 카테고리의 다른 글
China: Spring Festival Holidays in 2024 (0) | 2024.01.30 |
---|---|
China: CCC announces 6 new EMC standards (0) | 2024.01.30 |
< China: CCC, Launches Electronic Certificate> (0) | 2024.01.30 |
KSA: SASO, New SASO EMC Regulation (0) | 2024.01.23 |
China: CEL, Revise Energy efficiency catalog (0) | 2024.01.23 |